Live · Plant 01 · Shift B
Alarm Center
Real-time alarm wall · filter, acknowledge, correlate
Total
8
Critical
3
Warning
3
Acknowledged
3
| Time | ID | Machine | Severity | Message | Status | Action |
|---|---|---|---|---|---|---|
| 10:42:11 | AL-4821 | M102 | critical | Vibration exceeded critical threshold (7.8 mm/s) | OPEN | |
| 10:38:02 | AL-4820 | M301 | warning | Coil temperature approaching upper limit (742°C) | OPEN | |
| 10:31:45 | AL-4819 | M203 | critical | Spindle motor current spike detected | ACK | |
| 10:22:18 | AL-4818 | M401 | warning | Zinc bath concentration below setpoint | OPEN | |
| 10:14:03 | AL-4817 | M103 | info | Tool change reminder — 500 cycles remaining | ACK | |
| 09:58:29 | AL-4816 | M202 | critical | Hydraulic pressure loss — safety interlock engaged | OPEN | |
| 09:47:11 | AL-4815 | M501 | warning | Vision system calibration drift 1.4% | ACK | |
| 09:32:44 | AL-4814 | M302 | info | Preventive maintenance due in 24h | OPEN |