Executive Manufacturing Dashboard
Live plant intelligence · Plant 01 · Shift B · updated 12s ago

Production — Target vs Actual (24h)
Hourly output across all lines
OEE Composition (14d)
Availability · Performance · Quality
Downtime Pareto (24h)
Top loss reasons in minutes
Machine Status Map
All 12 machines · click on Digital Twin for details
Cold Forging
Cold Forging
Cold Forging
CNC Turning
CNC Turning
Milling
Milling
Heat Treatment
Heat Treatment
Plating
Inspection
Assembly
AI Recommendations
Correlated across PLC · Quality · SAP EAM
Bearing failure imminent on M102
criticalVibration on M102 rose 22% over 72h. Bearing replacement is 18 days overdue in SAP PM. Similar pattern preceded 2 failures in the last 6 months.
Rejection correlated with hydraulic pressure on M202
warningDiameter rejects on FRG-2048-A track a 6-bar pressure dip during Shift B. Root cause: accumulator pre-charge low.
Energy optimization on Line 3
infoInduction hardening idle-time energy is 18% above baseline. Enabling standby mode between batches saves ~640 kWh/week.
Active Alarms
5 unacknowledged
Vibration exceeded critical threshold (7.8 mm/s)
Coil temperature approaching upper limit (742°C)
Spindle motor current spike detected
Zinc bath concentration below setpoint
Tool change reminder — 500 cycles remaining
Hydraulic pressure loss — safety interlock engaged